Tracking Time with Custom Macro
System variables allow for time-based applications like tool-life monitoring, preventive maintenance, sampling inspections and machine warm-up.
Share





Custom Macro gives you the ability to monitor time from within a CNC program. System variables provide access to two timers (milliseconds and hours), a calendar (year, month, day) and a clock (hours, minutes, seconds):
• #3001 millisecond timer
• #3002 hour timer
• #3011 date (yyyymmdd)
• #3012 time (hhmmss)
The millisecond timer (#3001) will run for about 600 hours before it automatically resets. The hour timer (#3002) will run for about 9,500 hours before resetting. They are always running, but can be reset at any time. Consider these commands that use the milliseconds timer to cause a 10-second dwell:
#3001 = 0 (Reset millisecond timer)
N1 IF [#3001 GT 10000] GOTO 5
GOTO 1
N5 …
The date and clock functions work differently. If the present date and time is February 3, 2018, at 3:39:02 p.m., the current date and time system variable values will display as follows:
#3011: 20180203
#3012: 153902
The clock uses a 24-hour format: 15:39 is, of course, 3:39 p.m. Since these system variables run in sync with the CNC’s system clock, it is possible to track events over longer periods of time.
These time-related system variables also allow unique time-based applications. Think of situations in which events must be timed:
• How long a cutting tool is machining (part of a tool-life monitoring system).
• Preventive maintenance tasks, like filter changes.
• Time-based sampling inspections.
• Machine warm-up after a period of non-use.
The following time-based spindle warm-up example was suggested by Ryan McKibbin of the Maryland Institute College of Art. A machine spindle’s thermal expansion during warm-up may cause size deviations that make it impossible to run acceptable workpieces until it warms up. The warm-up routine must be run whenever the spindle cools, such as after off-shifts and whenever the machine is idle for more than an hour.
As Mr. McKibbin’s program shows, tracking when the warm-up program is required can be programmed by including a few commands at the beginning and end of all programs:
%
O0001
IF [[[#509 + 010000] GT #3012] AND [#508 EQ #3011]] GOTO 5
#3006 = 1 (Cold spindle – press cycle start)
M03 S12000
G04 P120000
M03 S18000
G04 P120000
M03 S23000
G04 P60000
M05
#3006 = 2 (Warm-up over – press cycle start)
(Machining program begins here)
N5 . . .
(At the end of the program:)
#508 = #3011
#509 = #3012
M30
%
Permanent common variables #508 and #509 keep track of the last date and time when the machine finished running a program. The IF statement tests the last completion time plus one hour against the current time and the last completion date against the current date. If more than an hour has elapsed, or if the date changes, the operator is instructed (by the #3006 stop with message command) to press the cycle start button to run the warm-up routine. The warm-up routine could, of course, be run automatically by eliminating the stop with a message command.
The warm-up routine starts the spindle at varying speeds, and the CNC will dwell appropriately until the spindle warms up. After the spindle warms up, the operator is instructed to press the cycle start button again to run the program. This could also be an automatic action.
Permanent common variables #508 and #509 are updated at the end of the program, so new time and date values will be considered the next time the program is run.
Related Content
4 Tips for Staying Profitable in the Face of Change
After more than 40 years in business, this shop has learned how to adapt to stay profitable.
Read More6 Variations That Kill Productivity
The act of qualifying CNC programs is largely related to eliminating variations, which can be a daunting task when you consider how many things can change from one time a job is run to the next.
Read More2 Secondary Coordinate Systems You Should Know
Coordinate systems tell a CNC machine where to position the cutting tool during the program’s execution for any purpose that requires the cutting tool to move.
Read More4 Rules for Running a Successful Machine Shop
Take time to optimize your shop’s structure to effectively meet demand while causing the least amount of stress in the shop.
Read MoreRead Next
Machine Shop MBA
Making Chips and ¸ßÅâÂÊÁùºÏ²Ê are teaming up for a new podcast series called Machine Shop MBA—designed to help manufacturers measure their success against the industry’s best. Through the lens of the Top Shops benchmarking program, the series explores the KPIs that set high-performing shops apart, from machine utilization and first-pass yield to employee engagement and revenue per employee.
Read MoreAMRs Are Moving Into Manufacturing: 4 Considerations for Implementation
AMRs can provide a flexible, easy-to-use automation platform so long as manufacturers choose a suitable task and prepare their facilities.
Read More